Product image product description.
Steel beam over bifold doors.
Above the rsj steel beam we dry pack the small gaps up to the first floor support with a semi dry strong 2 1 cement mixture this is compacted into the gaps between the beam and the first floors.
In these cases they were packed with oak timbers struts to spread the floor loads correctly across the rsj steel beams.
With regard to the bifold doors they are more commonly installed and operate much better when hanging from a perfectly smooth and level steel beam as oppose to rolling on a not so accurate floor.
The roof construction is 145x45 x3m c16 timbers on 400 centres with a warm deck construction using osb and expanded pu foam insulation.
As part of our steel beam design service we prepare the structural calculations to specify the correct steel beam sizes to install for the client.
The beam will more than take the weight of the doors and you can guarantee that the doors will work perfectly when installed in this way.
Door shall be mounted on the exterior walls of building.
I don t know what is the best option.
20 x 12 up to 22 in 2 increments 22 x 12 up to 22 in 2 increments 24 x 12 up to 22 in 2 increments.
The next phase is removal of the load bearing rear wall and installation of temporary structural supports using heavy duty acrow props.
Select one b face mount.
Door shall be mounted flush with exterior walls of building select one.
The problem is that i want to install 3m wide sliding doors and they will need a lintel to support the roof beams.
In addition to installing a steel beam for horizontal loading your scheme must also fall within approved document a guidance limits for percentage and size of openings across the elevation you are proposing to install the bi fold doors.
Schweiss bifold doors can fit any steel buildings old or new providing a commercial door that suits your needs.