Install zee closures onto panels at both sides.
Standing seam metal roof installation instructions.
Installation of a standing seam metal roof involves joining vertical interlocking panels from the top of the roof ridge to the roof s eave edge.
Step by step instruction on how to install a standing seam metal roof.
Fasten with appropriate substrate fastener at minimum 4 fasteners per zee or 3 inches on center.
Necessary tools materials and supplies a roofing hatchet or a carpenter s hammer.
From underlayment venting layout.
Pancake screws are applied to the nail strip of the standing seam panels.
In cold weather slide the panels tight against the eave flashing and in warm weather allow a gap for expansion.
The area where each panel joins the next is raised above the roof s flat surface.
Apply row of tube sealant along back face of zee closure adjacent to panel legs.
Use endwall flashing to locate correct position of zee closures.
Metal roofing panels are now available in a wide range of colors and styles.
Standing seam metal roof installation process.
I prefer a hatchet but in some.
Place the first panel with overlap leg along the alignment line.
We cover all the basics of metal roof installation.
When used extended drip edge should be installed first along the drip edge of the roof.
Install endwall flashing onto zee closures by riveting flashing to top flange of zees at 18 inches on center onto top flange of zee.